logo

Arayat solar farm phase 2

Sector: Automotive • Location: Philippines

Source: World Bank Group

Project
Active

The project involves the design, construction, operation and maintenance of the 30MWac (43.7MWdc) second phase of Arayat solar farm located in Pampanga province of the Philippines. The 50MWac (72MWdc) phase 1 of the project was constructed in June 2021 and reached its full capacity in March 2022. Greencore Power Solutions 3 Inc. is the special purpose vehicle of the phase 2 solar project. Sponsor

Status
Prospective
Sector
Automotive, Commercial, Power Generation (CCGT), Raw Materials, Solar, Residential, Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Arayat solar farm phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Arayat solar farm phase 2” is an infrastructure initiative in the Automotive sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the design, construction, operation and maintenance of the 30MWac (43.7MWdc) second phase of Arayat solar farm located in Pampanga province of the Philippines. The 50MWac (72MWdc) phase 1 of the project was constructed in June 2021 and reached its full capacity in March 2022. Greencore Power Solutions 3 Inc. is the special purpose vehicle of the phase 2 solar project. Sponsors are Citicore Solar Energy (50%), ACEN Corp (45%), and ACEN's wholly-owned subsidiary ACE Endevor (5%). The SPV received a P2.3 billion ($43.8 million) loan from ACEN to fully finance the second phase, which is scheduled for commercial operations in February 2023. Greencore secured the loan with a real estate mortgage over its real assets, a pledge over its shares, and the project's cash flows. Financial close was achieved on 1 June, 2022. Realfin https://www.philstar.com/business/2022/05/27/2183921/acen-extends-p23-billion-loan-fund-pampanga-solar-farm

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Commercial, Power Generation (CCGT), Raw Materials, Solar, Residential, Government

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project