logo

Arayat solar farm phase 2

Sector: Solar • Location: Philippines

Source: World Bank Group

Project
Active

The project involves the design, construction, operation and maintenance of the 30MWac (43.7MWdc) second phase of Arayat solar farm located in Pampanga province of the Philippines. The 50MWac (72MWdc) phase 1 of the project was constructed in June 2021 and reached its full capacity in March 2022. Greencore Power Solutions 3 Inc. is the special purpose vehicle of the phase 2 solar project. Sponsor

Project Information FAQ

Project Information

5 Q
The project “Arayat solar farm phase 2” is an infrastructure initiative in the Solar sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the design, construction, operation and maintenance of the 30MWac (43.7MWdc) second phase of Arayat solar farm located in Pampanga province of the Philippines. The 50MWac (72MWdc) phase 1 of the project was constructed in June 2021 and reached its full capacity in March 2022. Greencore Power Solutions 3 Inc. is the special purpose vehicle of the phase 2 solar project. Sponsors are Citicore Solar Energy (50%), ACEN Corp (45%), and ACEN's wholly-owned subsidiary ACE Endevor (5%). The SPV received a P2.3 billion ($43.8 million) loan from ACEN to fully finance the second phase, which is scheduled for commercial operations in February 2023. Greencore secured the loan with a real estate mortgage over its real assets, a pledge over its shares, and the project's cash flows. Financial close was achieved on 1 June, 2022. Realfin https://www.philstar.com/business/2022/05/27/2183921/acen-extends-p23-billion-loan-fund-pampanga-solar-farm

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data