logo

Arboretum Waterway Improvements

Sector: Water Supply and Storage • Location: Davis, California, United States of America

Source: UC Davis Projects

Project
Close

The proposed Arboretum Waterway Improvements project is a water recycling project. The purpose of the project is to improve the water quality in the Arboretum Waterway, which is stagnant, by keeping water flowing through the waterway year-round. The project would consist of re-operating an existing, but currently unused, 18-inch pipeline to circulate tertiary-treated water from the existing campus

Project Information FAQ

Project Information

4 Q
The project “Arboretum Waterway Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Davis, California, United States of America. Taiyo aggregates data on it from UC Davis Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Arboretum Waterway Improvements project is a water recycling project. The purpose of the project is to improve the water quality in the Arboretum Waterway, which is stagnant, by keeping water flowing through the waterway year-round. The project would consist of re-operating an existing, but currently unused, 18-inch pipeline to circulate tertiary-treated water from the existing campus wastewater treatment plant (WWTP) through the Arboretum Waterway before discharging it to Putah Creek. Tertiary-treated wastewater has undergone filtration that removes additional pathogens and contaminants and meets Department of Health Services’ standards under Title 22 of the California Code of Regulations for unrestricted recycling uses. The campus’s wastewater already is being discharged to Putah Creek, so the project would extend the route that the wastewater takes before discharge. The project would involve installation of two valves, a connecting pipeline, and an outfall structure in order to accomplish the project purpose.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data