Parkwind, 50Hertz and Bladt Industries have successfully installed the Arcadis Ost offshore substation (OSS). The 2380-ton structure was installed by the Scaldis crane vessel Gulliver on its monopile foundation in the wind farm Arcadis Ost 1 located around 19 kilometres east of Rügen in Germany.    Developed in collaboration with 50Hertz, the 30-metre high OSS in the centre of the windfarm will co

Project Information FAQ

Project Information

3 Q
The project “Arcadis Ost Offshore Substation installed” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Poland. Taiyo aggregates data on it from Energy Projects & Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Parkwind, 50Hertz and Bladt Industries have successfully installed the Arcadis Ost offshore substation (OSS). The 2380-ton structure was installed by the Scaldis crane vessel Gulliver on its monopile foundation in the wind farm Arcadis Ost 1 located around 19 kilometres east of Rügen in Germany.    Developed in collaboration with 50Hertz, the 30-metre high OSS in the centre of the windfarm will collect the green power created by the 27 wind turbines, transform the power to a level of 220 kV and export it onshore to the German 50Hertz grid connection point in Lubmin.  After the platform-supporting foundation, the so-called monopile, with a weight of around 2100 tons was erected on June 8, 2022, the final installation of the platform took place already today in the morning. In total, the offshore transformer platform together with its foundation weighs over 5,000 tons. The OSS was designed, fabricated, and installed by the Danish contractor Bladt Industries.  The substation was pre-fabricated in Poland and final assembly and equipment took place at Bladt Industries in Aalborg, Denmark from mid-2021. Semco Maritime provided design, installation and commissioning of the high, medium and low voltage equipment. Manfred Dittmer, Parkwind’s Country Manager Germany, commented: “With the installation of the Arcadis Ost 1 substation, we reach another key milestone and maintain our tight installation schedule. We have surrounded ourselves with trusted partners like Bladt Industries and Semco to deliver an offshore substation of the highest-standards. Jointly developed with 50Hertz, this substation is a good example of European collaboration and is setting new standards for future offshore energy in Germany.” Stefan Kapferer, CEO 50Hertz added: “I congratulate everyone involved on the successful installation of the Arcadis Ost platform in the Baltic Sea! We have thus reached an important milestone on the way to commissioning a great European joint project. As soon as our grid connection system Ostwind 2 goes into operation, more than half a million households will be able to be supplied with electricity from renewable offshore wind energy. This will increase our energy sovereignty, make us less dependent on fossil fuels and help us achieve our climate targets. We can’t do this alone, but in good cooperation. We will steadily expand cooperation with our European partners in the coming years.” Bladt Industries CEO Anders Søe-Jensen also commented: “We are pleased to have reached this important milestone in collaboration with our partner Semco Maritime. It is great to be part of another project for our customers Parkwind and 50Hertz, together contributing to the green energy transition and clean energy supply in Germany. Source: https://www.50hertz.com/Image source: Courtesy of 50Hertz Read more Wind energy news here

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data