Arcelor Mittal-Nippon Steel India Integrated Steel Plant
The owner, status and timeline of this project. A free account opens every field.
Source: The South First
A ₹1.4 lakh crore integrated steel plant with a capacity of 17.8 million tonnes located in Anakapalli. The project is a flagship initiative signed via MoU in July 2024 but is facing delays due to environmental clearances and local opposition to land pooling.
- Status
- Failure
- Sector
- Steel, Metal, Manufacturing (Industrial)
- Location
- Anakapalli, Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- The South First
ConstructChat
Ask ConstructChat about Arcelor Mittal-Nippon Steel India Integrated Steel Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A ₹1.4 lakh crore integrated steel plant with a capacity of 17.8 million tonnes located in Anakapalli. The project is a flagship initiative signed via MoU in July 2024 but is facing delays due to environmental clearances and local opposition to land pooling. |
Original sector | Industrial |
Budget |
Location
Country | India |
State | Andhra Pradesh |
City | Anakapalli |
Source
Source | The South First |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Manufacturing (Industrial) |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
