logo

Architecture Classics: Julio Mario Santo Domingo Cultural Center / Bermúdez Arquitectos

Sector: Road

Source: ArchDaily

Project
Closed

In theaters, the technical and spatial deployment is astonishing. Consistent with a long stage tradition, the auditorium with a horseshoe layout maintains a maximum distance of 22 meters between the audience and the actors, a measurement that allows for recognizing gestures. While the large stage provides all creative possibilities for theatrical directors, the backstage area is managed with the r

Project Information FAQ

Project Information

3 Q
The project “Architecture Classics: Julio Mario Santo Domingo Cultural Center / Bermúdez Arquitectos” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In theaters, the technical and spatial deployment is astonishing. Consistent with a long stage tradition, the auditorium with a horseshoe layout maintains a maximum distance of 22 meters between the audience and the actors, a measurement that allows for recognizing gestures. While the large stage provides all creative possibilities for theatrical directors, the backstage area is managed with the rationality typical of a production area.In the constructed ensemble, and particularly in the reading rooms, the treatment of light is fundamental. Thanks to the intentional separation between plates and walls, it is possible to anticipate that sun rays fall upon walkways rather than spaces. In the children's reading room, a sculptural skylight provides white surfaces at a 45-degree angle that reflect sunlight, avoiding direct contact.The Cultural Center, a donation from the Santo Domingo family, houses two main activities situated on either side of a high-ceilinged lobby that captures northern views and sunlight. On the left side of the central space, marked by a cloakroom, there is a megabiblioteca from the Bibliored system. On the right, indicated by a ticket booth, there are two theaters: one with an experimental nature for 400 people, and another for multiple uses with variable acoustics, capable of hosting opera performances for 1300 people. In the basement, there are 320 parking spaces and technical services.The intervention project includes the design of the Julio Mario Santo Domingo Cultural Center and Public Library, as well as the 6-hectare San José de Bavaria recreational park. With its completion, a new recreational and cultural hub was established for the Suba area and the city.The materials utilized in the complex are durable. The light-colored concrete reflects the Bogotá light and doesn't demand maintenance. However, this same brightness of the bush-hammered limestone aggregate hinders its application on stages. The theaters presented here contrast materially from the rest of the cultural complex due to a reddish additive integrated into the exposed concrete in both interior and exterior spaces. Meticulous craftsmanship with formwork leads to numerous aesthetic and practical innovations. For instance, the cavities left by the formwork in the walls transform into delicate apertures for the passage of light, achieved by inserting small test tubes with double caps.The proposed building within the park is set back 40 meters from the road due to the existing eucalyptus trees. Within this setback, public spaces are developed, featuring vegetation and pavement with varying colors and textures, as well as a staircase for transit and relaxation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data