logo
ProjectStart

Archmount Cemetery Irrigation Pump Construction

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

the supply and installation of all components required to operate the cemetery irrigation pump system per the design drawings and technical specifications, commission the new pump, and employ all required safety measures during construction

Status
Prospective
Sector
Water Supply and Storage, Government, Raw Materials, Commercial
Location
Lethbridge, Alberta, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Archmount Cemetery Irrigation Pump Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Archmount Cemetery Irrigation Pump Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Lethbridge, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

the supply and installation of all components required to operate the cemetery irrigation pump system per the design drawings and technical specifications, commission the new pump, and employ all required safety measures during construction

Procurement method

Location

Country

Canada

State

Alberta

City

Lethbridge

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Raw Materials, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project