logo

Arctic Deep Draft Port

Sector: Bridge • Location: United States of America (USA)

Source: ENR News

Project
Under Planning

The U.S. Army Corps of Engineers is planning to construct the Arctic Deep Draft Port in Nome. The project will double the length of the port’s existing west causeway to reach approximately 2,100 ft farther into Norton Sound with a nearly 1,400-ft breakwater to protect the harbor entrance from incoming waves. The L-shaped barrier will also hold two new 450-ft docks and one new 600-ft dock to handle

Project Information FAQ

Project Information

5 Q
The project “Arctic Deep Draft Port” is an infrastructure initiative in the Bridge sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The U.S. Army Corps of Engineers is planning to construct the Arctic Deep Draft Port in Nome. The project will double the length of the port’s existing west causeway to reach approximately 2,100 ft farther into Norton Sound with a nearly 1,400-ft breakwater to protect the harbor entrance from incoming waves. The L-shaped barrier will also hold two new 450-ft docks and one new 600-ft dock to handle larger vessels. The existing east causeway breakwater will be demolished and replaced with a larger, 3,900-ft causeway-breakwater that will greatly expand the port’s outer basin. The bigger outer port basin will also be dredged deeper—from 22 ft currently to 28 ft—and the three new docks will be near the end of the longer west causeway breakwater in an area dredged to at least 40 ft deep. A two-year design phase began in the spring of 2021.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data