logo

Arctic LNG 2 Project

Sector: Natural Gas • Location: Russia

Source: The Economic Times

Project
Behind Schedule

The Arctic LNG 2 project is a Russian liquefied natural gas (LNG) project that started in late 2023 but is behind schedule due to shortages of carriers and sanctions imposed by the West. The project had to halt operations in October 2024 but has since loaded about six LNG cargoes, with four discharged at a Chinese port.

Status
Prospective
Sector
Natural Gas, LNG, Government
Location
Russia
Updated
22 Jul 2026
Source
The Economic Times

ConstructChat

Ask ConstructChat about Arctic LNG 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Arctic LNG 2 Project” is an infrastructure initiative in the Natural Gas sector, located in Russia. Taiyo aggregates data on it from The Economic Times.

Participants

Sponsoring Agency

Status

Original status

behind schedule

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Arctic LNG 2 project is a Russian liquefied natural gas (LNG) project that started in late 2023 but is behind schedule due to shortages of carriers and sanctions imposed by the West. The project had to halt operations in October 2024 but has since loaded about six LNG cargoes, with four discharged at a Chinese port.

Original sector

Energy

Location

Country

Russia

Source

Source

The Economic Times

URL

More Details

Record type

Project

Sector

Natural Gas, LNG, Government

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project