logo
ProjectUnder Construction With Delays

Arctic LNG 2 Project

Under construction with delays · Russia · Last reported Jan 2026

Source: The Moscow Times

Arctic LNG 2 is a liquefied natural gas project in Russia designed to produce 19.8 million tons per year. Construction of the third train has been postponed due to sanctions and lack of access to Western turbines and equipment, leading to stagnation and technological degradation.

Status
Under Construction
Sector
Rail, LNG, Natural Gas
Location
Russia
Updated
22 Jul 2026
Source
The Moscow Times

ConstructChat

Ask ConstructChat about Arctic LNG 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Arctic LNG 2 Project” is an infrastructure initiative in the Rail sector, located in Russia. Taiyo aggregates data on it from The Moscow Times.

Participants

Not available for this record.

Status

Original status

under construction with delays

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Arctic LNG 2 is a liquefied natural gas project in Russia designed to produce 19.8 million tons per year. Construction of the third train has been postponed due to sanctions and lack of access to Western turbines and equipment, leading to stagnation and technological degradation.

Original sector

Energy

Location

Country

Russia

Source

Source

The Moscow Times

URL

More Details

Record type

Project

Sector

Rail, LNG, Natural Gas

Article published date

2026-07-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project