AR/DOT: Hicks Creek Bridge Structure & Approaches (CO 070)
Sector: Water Supply and Storage • Location: Mountain Home, Arkansas, United States of America
Source: Dodge
The Purpose Of This Project Is To Replace One Structure On Highway 5 In Baxter County. This Project Consists Of Removal And Disposal Items, Earthwork, Aggregate Base Course, Portland Cement Concrete Base, Achm Base, Binder, And Surface Courses, Cold Milling Asphalt Pavement, Achm Patching Of Existing Roadway, Portland Cement Concrete Driveway, Maintenance Of Traffic, Minor Drainage, Erosion Contro
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Residential, Cement, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Mountain Home, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AR/DOT: Hicks Creek Bridge Structure & Approaches (CO 070)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Purpose Of This Project Is To Replace One Structure On Highway 5 In Baxter County. This Project Consists Of Removal And Disposal Items, Earthwork, Aggregate Base Course, Portland Cement Concrete Base, Achm Base, Binder, And Surface Courses, Cold Milling Asphalt Pavement, Achm Patching Of Existing Roadway, Portland Cement Concrete Driveway, Maintenance Of Traffic, Minor Drainage, Erosion Control, Pavement Marking, Construct A Quint R.c. Box Culvert (64'4"), And Misc Items. ROUTES: 5 SECTIO... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Mountain Home |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Residential, Cement, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
