AR/DOT: Rte 67 Caddo River Structure and Approaches (CO 060)
Sector: Water Supply and Storage • Location: Arkadelphia, Arkansas, United States of America
Source: Dodge
The Purpose Of This Project Is To Replace One Structure On Highway 67 In Clark County. This Project Consists Of Clearing And Grubbing, Removal And Disposal Items, Earthwork, Aggregate Base Course, Achm Base, Binder, And Surface Courses, Cold Milling Asphalt Pavement, Achm Patching Of Existing Roadway, Approach Slabs, Portland Cement Concrete Driveway, Maintenance Of Traffic, Concrete Ditch Paving,
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Bridge, Waste Processing and Treatment, Rail, Car parking, Commercial, Automotive, Manufacturing (Industrial)
- Location
- Arkadelphia, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AR/DOT: Rte 67 Caddo River Structure and Approaches (CO 060)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Purpose Of This Project Is To Replace One Structure On Highway 67 In Clark County. This Project Consists Of Clearing And Grubbing, Removal And Disposal Items, Earthwork, Aggregate Base Course, Achm Base, Binder, And Surface Courses, Cold Milling Asphalt Pavement, Achm Patching Of Existing Roadway, Approach Slabs, Portland Cement Concrete Driveway, Maintenance Of Traffic, Concrete Ditch Paving, Minor Drainage, Erosion Control, Concrete Island And Walks, Hand Railing, Concrete Curb And Gutt... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Arkadelphia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Bridge, Waste Processing and Treatment, Rail, Car parking, Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
