Areia Branca Hydroelectric Project
One of 10,000+ projects Taiyo tracks in Brazil.
Source: World Bank Group
In September 2006, Econergy International Plc. [USA] entered into an agreement with HydroPartners, LLC to invest in Hidreletrica Areia Branca, a 19 MW Hydroelectric facility in Minas Gerais.
The license to built and operate the power plant was initially granted to HP1 do Brasil Ltda in May 2000, with a 30-year duration (subject to extension pending negotiations between the parties). In 2006, th
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Government, Hydro
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Areia Branca Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2006, Econergy International Plc. [USA] entered into an agreement with HydroPartners, LLC to invest in Hidreletrica Areia Branca, a 19 MW Hydroelectric facility in Minas Gerais. The license to built and operate the power plant was initially granted to HP1 do Brasil Ltda in May 2000, with a 30-year duration (subject to extension pending negotiations between the parties). In 2006, the license was transferred to Hidreletrica Areia Branca S.A., a partnership of Econergy International Plc. [USA] and HydroPartners, LLC. In December 2008, when the project company was a wholly-owned subsidary of Ecoenergy, Suez GDF, a subsidiary of Suez [France] acquired Econergy International Plc and all its subsidiaries. The project benefitted from its participation in Proinfa. Proinfa was a program designed to stimulate alternative energy projects. Under the program, the federal power utility Eletrobras contracted for a 20-year period the electricity production of alternative projects to provide sustainable development of the sector. The total project cost was estimated to be US $48 million. In January 2008, Econergy's subsidiary, Hidreletrica Areia Branca, signed a construction and non recourse long-term take-out loan agreement for the project with Brazil's Banco Nacional de Desenvolvimento Economico e Social (BNDES) for R$55.6 MM (US $31.8 million) or 66.4% of total project cost. The loan had A term of 14 years, post an initial grace period on payment of interest and principal during construction and 6 months after commercial operation and an interest rate of TJLP (Taxa de Juros de Longo Prazo, the long-term interest rate in Brazil) plus 2.5%, an overall interest rate of 8.75%. Econergy International was to provide an unsecured guarantee for the full amount of the loan during the construction period. After commercial operation Econergy was to provide annual payment support until stated debts ervice coverage ratios were met at which time the loan will become fully non-recourse to the Company for the remainder of its term. In March 2010, the power plant began to operate. Will become operational 1Q 2009. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Government, Hydro |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- GNA II LNG Power Plant Rio de Janeiro Brazil
- Governador Jos Richa Hydroelectric Plant Brazil
- Energisa Renascenca Wind Farm
- Delfina wind park expansion
- Serveng Civilsan Rio Grande do Norte Wind Farms
- Elektro Eletricidade e Servicos SA (Elektro)
- Foz do Rio Claro Hydro Power Plant
- Empresa Regional de Transmissao de Energia S.A. (ERTE)
