Arembepe Thermal Power Project
Sector: Commercial • Location: Brazil
Source: World Bank Group
In April 2007, the Brazilian company Arembepe Energia S.A. was granted an authorization to build a 150 -MW thermal power plant located in the state of Bahia (municipality of Camaçari). Arembepe Energia S.A. signed a 35-year contract with the regulatory agency ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the r
- Status
- Prospective
- Sector
- Commercial, Geothermal, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Arembepe Thermal Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 2007, the Brazilian company Arembepe Energia S.A. was granted an authorization to build a 150 -MW thermal power plant located in the state of Bahia (municipality of Camaçari). Arembepe Energia S.A. signed a 35-year contract with the regulatory agency ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. The power plant was set to use diesel as fuel. Arembepe Energia was established as a partnership of the state-owned Petrobras (30%) and Nova Cibe Energia (70%). As of December 2009, Nova Cibe was owned by Bertin (50%) and Equipav (50%). In 2006, the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). Arembepe Energia S.A. committed to invest US$ 182.5 million (BRL 334 million) in the facility. In February 2008, the company was granted a US$ 102.8 million (BRL 188.3 million) syndicated loan contract from BNB (Banco do Nordeste), a state-owned development bank. Construction works on this plant were concluded in March 2010, and operations commenced in May 2010. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Power Generation (CCGT), Government |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line