Arena Floor Replacement
Sector: Commercial • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The existing cement flooring and piping will have to be demolished and removed. Site preparations would be required. New piping and cement floor will be replaced. Some dasher boards will have to be replaced on both ends of the rink.
- Status
- Closed
- Sector
- Commercial, Stadium
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Arena Floor Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing cement flooring and piping will have to be demolished and removed. Site preparations would be required. New piping and cement floor will be replaced. Some dasher boards will have to be replaced on both ends of the rink. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Commercial, Stadium |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
