Argentina LNG (ARGLNG) Project
Sector: LNG • Location: Argentina
Source: AKM.RU
The ARGLNG project is a large-scale integrated project to extract shale gas from the Vaca Muerta field and export up to 30 million tons of LNG to international markets by 2030. It involves the liquefaction of gas on two floating installations (FLNG) with a capacity of 6 million tons per year each and the export of related elements. The project aims to increase productivity to 18 million tons per y
- Status
- Prospective
- Sector
- LNG, Natural Gas, Oil and Gas, Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- AKM.RU
ConstructChat
Ask ConstructChat about Argentina LNG (ARGLNG) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The ARGLNG project is a large-scale integrated project to extract shale gas from the Vaca Muerta field and export up to 30 million tons of LNG to international markets by 2030. It involves the liquefaction of gas on two floating installations (FLNG) with a capacity of 6 million tons per year each and the export of related elements. The project aims to increase productivity to 18 million tons per year and has estimated investments of $50 billion. |
Original sector | Energy |
Budget |
Location
Country | Argentina |
Source
Source | AKM.RU |
URL |
More Details
Record type | Project |
Sector | LNG, Natural Gas, Oil and Gas, Government |
Article published date | 2025-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More LNG projects in Argentina
- Anchoris LNG Power station
- Vaca Muerta Shale Oil and Gas Field
- Escobar LNG Terminal
- Upgrade of FLNG Hilli Episeyo for redeployment in Argentina
- Installation of SSY Mooring System and Hook-up of Hilli Episeyo and MKII FLNG Vessels
- Southern Energy LNG Project
- LNG Project MoU between Eni and YPF
- Argentina Integrated Liquefied Natural Gas Project (ARGLNG)
