logo
ProjectClosed

Argentina Mining Environmental Restoration Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank

The objectives of the Mining Environmental Restoration Project (GP) are to: (a) strengthen Government of Argentina (GOA) capacity to assess and mitigate environmental risks associated with closed uranium mines, processing sites, and related mining sector investments, in accordance with international good practice; and (b) reduce potential economic and health damages associated with a closed uraniu

Status
Closed
Sector
Water Supply and Storage, Nuclear, Government
Location
Argentina
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Argentina Mining Environmental Restoration Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Argentina Mining Environmental Restoration Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Argentina. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Mining Environmental Restoration Project (GP) are to: (a) strengthen Government of Argentina (GOA) capacity to assess and mitigate environmental risks associated with closed uranium mines, processing sites, and related mining sector investments, in accordance with international good practice; and (b) reduce potential economic and health damages associated with a closed uranium milling site in Malargue and Mendoza. There are three components to the project. The first component is the remediation of the Malargue site. The project will fund remediation works, including the safe disposal of 710,000 tons of tailings and soils, structures to prevent groundwater contamination and dust, and measures to abate radiation and radon emissions. Contracting has been done in conformance with World Bank procedures and civil works have already begun (and as of May, 2008, the required investment is about 30 percent complete). Independent construction supervision conducted by a Bank-hired technical expert has reviewed the design and certified the quality of construction to date. The second component is the mine restoration planning and institutional strengthening. The project will provide technical assistance to study and design remediation options to clean up the additional sites, and support the environmental and social consultation processes required as per international best practice. The project will also fund an international advisory group to advice on the approaches being suggested for each site. Finally, the third component is the project management. The project implementation unit of the GP will be responsible for project implementation, reporting, project monitoring, and impact evaluation of key interventions.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Argentina

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Nuclear, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project