logo

Argonne Energy Sciences Building

Sector: Commercial • Location: Argonne, Illinois, United States of America

Source: Clark Construction

Project

The Argonne Energy Sciences Building at Argonne National Laboratory is a premier interdisciplinary physical sciences laboratory designed to encourage collaboration between more than 240 scientists working to address complex issues regarding how the world consumes and conserves energy. Their work facilitates advancement in areas related to national security and economic growth and is supported by t

Project Information FAQ

Project Information

4 Q
The project “Argonne Energy Sciences Building” is an infrastructure initiative in the Commercial sector, located in Argonne, Illinois, United States of America. Taiyo aggregates data on it from Clark Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Argonne Energy Sciences Building at Argonne National Laboratory is a premier interdisciplinary physical sciences laboratory designed to encourage collaboration between more than 240 scientists working to address complex issues regarding how the world consumes and conserves energy. Their work facilitates advancement in areas related to national security and economic growth and is supported by this 158,000-square-foot facility featuring high levels of research space flexibility, technical systems quality, and collaborative workplace design. Functional and Distinctive Design Funded by the Department of Energy, the four-level research facility features 50,000 square feet of laboratory space, a below-grade level, and a mechanical penthouse. It was designed and built on a standard module to promote flexibility and accommodate Argonne's evolving needs. For example, overhead service carriers allow the laboratories to be quickly altered at minimal cost to accommodate evolving research directions, objectives, and programs. Servicing the labs through a central utility core allows the open office spaces to be immediately adjacent to the labs, thereby increasing opportunities for interdisciplinary collaboration between scientists. The building also plays a transformative role within the Argonne National Laboratory campus. Located near the entrance, the Energy Sciences Building ushers a new era of science and a commitment to sustainable design principles. The building was master planned to link two existing adjacent buildings and an additional future building to establish a four-building "Energy Quad" complex. Its striking appearance also demands attention. The north elevation of the building is defined by a copper-anodized rainscreen metal panel frame that surrounds a transparent low-iron glass façade. The south elevation features copper anodized panels and irregularly punched windows that limit solar penetration. A pair of two-story, stair-stepped atria are topped with skylights and finished with faux-rusted metal panels, reclaimed wood paneling, stainless steel, and glass guardrails. Collaborative communication between Clark, the construction manager, the client, and trade partners helped ensure a record of zero accidents or incidents and 100% compliance throughout construction. Weekly safety walks with the management team allowed leadership to ensure proper safety protocol was followed on site and the team promoted coordination between trade partners through “Plan of the Day” meetings. Finally, extensive building envelope inspections and testing were performed at every interval of the building’s skin installation for quality control. Awards 2014 Chicago Building Congress Merit Award (New Construction)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data