Arinos Solar Complex
The owner, status and timeline of this project. A free account opens every field.
Source: Construction Review
Enel Green Power has begun operation at the 611 MW Arinos Solar Complex in Minas Gerais, Brazil. The facility features over one million photovoltaic (PV) modules and has an energy substation constructed alongside it, capable of generating 1.4 TWh annually, enough to meet the demand of nearly 680,000 local homes.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- Construction Review
ConstructChat
Ask ConstructChat about Arinos Solar Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enel Green Power has begun operation at the 611 MW Arinos Solar Complex in Minas Gerais, Brazil. The facility features over one million photovoltaic (PV) modules and has an energy substation constructed alongside it, capable of generating 1.4 TWh annually, enough to meet the demand of nearly 680,000 local homes. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Minas Gerais |
Source
Source | Construction Review |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
