Arizona Resource Additions
Sector: Power Generation (CCGT) • Location: Arizona, United States
Source: MSN
Pinnacle West is planning to add 2,000 MW of resources in Arizona by 2030 to support the state's growth and energy needs.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- MSN
ConstructChat
Ask ConstructChat about Arizona Resource Additions
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pinnacle West is planning to add 2,000 MW of resources in Arizona by 2030 to support the state's growth and energy needs. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arizona |
Source
Source | MSN |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
