Arjun Sahayak Project
Closed · Uttar Pradesh
Source: India Investment Grid (IIG)
Information Irrigation & Water Resources-UP has come up with Arjun Sahayak Project with a ticket size of 2465.68 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project was included under National Project Scheme of DoWR, RD &GR in 2012. Further,
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Road, Government
- Location
- Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Arjun Sahayak Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Irrigation & Water Resources-UP has come up with Arjun Sahayak Project with a ticket size of 2465.68 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project was included under National Project Scheme of DoWR, RD &GR in 2012. Further, the project was included under Centrally Sponsored Scheme, PMKSY-AIBP in 2016 for funding and early completion. The project consists of the following- [i] 41.60 km long link channel of 73.60 cumec capacity from Lahchura dam to Arjun dam [ii] 31.80 km long link channel from Arjun dam to Kabrai dam connecting Chandrawal dam of 62.32 cumec capacity [iii] Raising of Kabrai dam by 9.23 m to an FRL of 163.46m thereby increasing capacity of Kabrai dam from 1240 ha m to 13025 ha m. [iv] Canal distribution system Total length of new canal system is 168.800 km which includes 53.400km new main canal and 115.40 km distributaries and minors. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 1675.04 crore Eligible Central Assistance was Rs 132.41 crore CA released since 2016 till 03/ 2023- Rs 116.57 crore Balance CA Rs. 15.8325 Cr. State Share released through NABARD under LTIF till October 2021- R 1353.80 crore Physical progress 99.99 percent Financial Progress 100 percent Ultimate Irrigation Potential is 44381 Ha Irrigation Potential created till 31.03.2023 41561 Ha Projected TDC 31.12.2019 Project Actual Date of Completion 30.11.2021 |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Uttar Pradesh |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Road, Government |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Nathpa Jhakri India Hydroelectric Power Plant
- Luhri StageI Hydroelectric Project Himachal Pradesh India
- Lower Subansiri Hydroelectric Power Project
