logo

Arjuna Medium Irrigation project

Sector: Hydro • Location: Ratnagiri, Maharashtra, India

Source: India Investment Grid (IIG)

Project
Closed

Information Department of water resources-MH - II has come up with Arjuna Medium Irrigation project with a ticket size of 611 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and pr

Project Information FAQ

Project Information

5 Q
The project “Arjuna Medium Irrigation project” is an infrastructure initiative in the Hydro sector, located in Ratnagiri, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Department of water resources-MH - II has come up with Arjuna Medium Irrigation project with a ticket size of 611 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. Arjuna Medium Irrigation project is situated in Ratnagiri District of Maharastra. It envisages construction of an earthen dam having length of 1145.50 m. The maximum height of the dam in river portion is 70.35 m. The un-gated spillway, having length 100 m, is located on left side to carry maximum flood to the tune of 1505.506 Cumecs. The catchment area is 28.409 Sqkms. The net 75percentage dependable yield at the dam site is 84.497 Mcum. The gross storage capacity of the dam is 74.67 Mcum. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 246.16 crore Eligible Central Assistance was Rs 17.69 crore CA released since 2016 till October 2021- 17.68 crore State Share released through NABARD under LTIF till October 2021- Rs 225.5 crore Physical progress- 81.89 percentage Financial Progress - 125.60 percentage Ultimate Irrigation Potential is 5700 Ha Irrigation Potential created till October 2021- 3670 Ha Projected Date of Completion- June 2024

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data