Ark Data Centres
Sector: Data Center
Source: Data Centre Magazine
Ark Data Centres has been integrating renewable energy sources into its operations from the very beginning. The company has moved from diesel to HVO, reducing its carbon footprint on-site by 95%. Ark's Spring Park location is designed to offer 46MW of IT load over nearly 200,000 sq ft of IT space.
- Status
- Under Construction
- Sector
- Data Center
- Updated
- 22 Jul 2026
- Source
- Data Centre Magazine
ConstructChat
Ask ConstructChat about Ark Data Centres
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ark Data Centres has been integrating renewable energy sources into its operations from the very beginning. The company has moved from diesel to HVO, reducing its carbon footprint on-site by 95%. Ark's Spring Park location is designed to offer 46MW of IT load over nearly 200,000 sq ft of IT space. |
Location
| Not available for this record. |
Source
Source | Data Centre Magazine |
URL |
More Details
Record type | Project |
Sector | Data Center |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Data Center projects
- Camrose City Hall
- CONSTRUCTION OF (N) 3-STORY, COLD SHELL DATA CENTER BUILDING W/ 257,610 SQ FT. OF BUILDING AREA
- PHASE 4-DATA CENTER-
- HAZARDOUS MATERIALS FOR DATA CENTER AND TRANSFORMER YARD
- PHASE 2-DATA CENTER- PART OF 3RD FLOOR AHU,ELECTRICAL ROOM, BATTERY ROOM.INSTALLATION GENERATORS& EQUIPMENT IN GEN YARD
- El Romero Solar Plant Atacama
- Rio Bravo Wind Farm Texas
- The Fowler Ridge Wind Farm Indiana
