Arkansas 112 Widening Project Phase 1
Sector: Road • Location: Fayetteville, Arkansas, United States
Source: Northwest Arkansas Democrat-Gazette
The first phase of the Arkansas 112 improvements involves widening 1.44 miles of the highway from two to four lanes between Truckers Drive and Howard Nickell Road in Fayetteville. The project includes the construction of three roundabouts, two turnaround locations, and a pedestrian tunnel to enhance traffic flow and safety.
- Status
- Closed
- Sector
- Road, Tunnel, Government
- Location
- Fayetteville, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Northwest Arkansas Democrat-Gazette
ConstructChat
Ask ConstructChat about Arkansas 112 Widening Project Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The first phase of the Arkansas 112 improvements involves widening 1.44 miles of the highway from two to four lanes between Truckers Drive and Howard Nickell Road in Fayetteville. The project includes the construction of three roundabouts, two turnaround locations, and a pedestrian tunnel to enhance traffic flow and safety. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Fayetteville |
Source
Source | Northwest Arkansas Democrat-Gazette |
URL |
More Details
Record type | Project |
Sector | Road, Tunnel, Government |
Article published date | 2025-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
