logo
ProjectEia

Armadale

The status, timeline and source of this project. A free account opens every field.

Proposed trident woodpole 132kV connection for Armadale Wind Farm. The connection would be approximately 6.9 km in length and T onto the separately proposed double circuit steel lattice 132 kV OHL for onward connection to Connagill kV substation

Status
Prospective
Sector
Road, Hydro, Power Generation (CCGT), Steel, Raw Materials, Wind, Government
Location
United Kingdom
Updated
19 Nov 2026
Source
Scottish Government Energy Consents Unit

ConstructChat

Ask ConstructChat about Armadale

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Armadale” is an infrastructure initiative in the Road sector, located in United Kingdom. Taiyo aggregates data on it from Scottish Government Energy Consents Unit.

Participants

Not available for this record.

Status

Original status

eia

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Proposed trident woodpole 132kV connection for Armadale Wind Farm. The connection would be approximately 6.9 km in length and T onto the separately proposed double circuit steel lattice 132 kV OHL for onward connection to Connagill kV substation

Original sector

Overhead Power Line

Location

Country

United Kingdom (UK)

Source

Source

Scottish Government Energy Consents Unit

URL

More Details

Record type

Project

Sector

Road, Hydro, Power Generation (CCGT), Steel, Raw Materials, Wind, Government

Article published date

2026-11-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project