logo

Armenia Lake Sevan Basin Environmental Project

Sector: Waste Processing and Treatment • Location: Armenia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

To improve wastewater treatment for five municipalities discharging wastewater into the Lake Sevan catchment basin. The operation will: build small wastewater treatment plants and rehabilitate wastewater networks in Gavar, Vardenis and Marduni; and, rehabilitate the wastewater networks in Sevan and Jermuk. The objective is to enable mechanical and enhanced aeration treatment of wastewaters dischar

Project Information FAQ

Project Information

3 Q
The project “Armenia Lake Sevan Basin Environmental Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Armenia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To improve wastewater treatment for five municipalities discharging wastewater into the Lake Sevan catchment basin. The operation will: build small wastewater treatment plants and rehabilitate wastewater networks in Gavar, Vardenis and Marduni; and, rehabilitate the wastewater networks in Sevan and Jermuk. The objective is to enable mechanical and enhanced aeration treatment of wastewaters discharged by the participating towns. The Armenia Water and Sewerage Company is currently operated by the international water services company Saur (France) under a management contract. The EBRD will mobilise advice to the Government of Armenia on how to extend the existing private sector participation when the existing contract expires in 2008. The Government of Armenia and the Armenian Water and Sewerage Company. Up to EUR 7.5 million loan to Armenia to be on-lent to the Armenian Water and Sewerage Company. EUR 12.5 million. The project has been screened B/1 in accordance with EBRD’s 2003 Environmental Policy. One of the main objectives of the operation is to reduce the on-going pollution of the Lake Sevan basin by untreated municipal wastewater. The new WWTPs in Gavar, Vardenis and Martuni and improved wastewater networks in five locations around the lake, including also the towns of Jermuk and Sevan, will improve wastewater collection and treatment and therefore reduce pollutants concentration in the receiving water bodies, from the point of discharge downstream to Lake Sevan. Although the effluent quality generated by the WWTPs will not comply fully with EU environmental standards, this investment represents the first step in re-establishing primary and secondary wastewater treatment in the area. The project implementation has been severely delayed for various reasons, including seasonal conditions in Lake Sevan area, and new WWTPs in Gavar, Martuni and Vardenis providing mechanical treatment for domestic (municipal) wastewaters became operational since 2013. Reduction in pollution of Lake Sevan and recipient rivers is expected to be substantial due to introduction of sewage treatment, and will be properly assessed via an independent environmental audit before the end of 2016. EBRD’s representatives carried out a monitoring visit to the WWTP sites in May 2014 and confirmed that overall performance of the Company on E&S matters is satisfactory and generally meets EBRD’s requirements. The water quality monitoring data was discussed with the Company. Since the WWTPs provide only mechanical treatment, the company reported that major reduction in concentration levels following treatment occurs in suspended solids and BOD. No reduction in organic pollutants (P and N) takes place due to absence of the biological/tertiary treatment, however space provisions for that have been made for the future at all three sites, subject to additional funding. AWSC has also reported diligently on environmental, health and safety matters and implemented the originally agreed EAP for the project. The necessary EHS controls have been introduced at the WWTP sites, and recommendations for further improvements included EHS Management System notice boards for staff, updated OHS manual for the Company, good housekeeping measures at storage facilities, proper storage and warning signs for hazardous materials and oils, and consideration of laboratories certification for water and wastewater monitoring. The Company is required to further improve its incident/accident reporting. Post-Signing: Services to advise the Government of Armenia on how to extend private sector participation in the management of the Armenian Water and Sewerage Company. Implementation support to assist the Armenian Water and Sewerage Company carry out the project. Angela Sax, Operation Leader: saxa@ebrd.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data