Armin Jahr Elementary School Replacement
Closed · Washington · Last reported Aug 2025
Source: Dodge
The AJES Project consists of a new two story 60,300 (approximate) SF wood framed school to replace the existing elementary school (Demolition of existing school was included in previous GMP). Scope of work also includes associated sitework and Off Site frontage improvements. The project is located at 800 Dibb Street, Bremerton, WA 98310. Please break out pricing between On-site and Off-site work,
- Status
- Closed
- Sector
- Warehouse, Road, Commercial, Government, Education
- Location
- Bremerton, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Armin Jahr Elementary School Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The AJES Project consists of a new two story 60,300 (approximate) SF wood framed school to replace the existing elementary school (Demolition of existing school was included in previous GMP). Scope of work also includes associated sitework and Off Site frontage improvements. The project is located at 800 Dibb Street, Bremerton, WA 98310. Please break out pricing between On-site and Off-site work, if applicable. Acknowledge the provided construction schedule, Logistic plan, Site Specific Safet... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bremerton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Warehouse, Road, Commercial, Government, Education |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in United States of America
- Woodridge traffic
- CONSTRUCTION OF NEW 103,406 SQ FT SPECULATIVE WAREHOUSE - INCLUDES LOT MERGER AND DEMO OF ALL (E) STRUCTURES
- NEW 9,870 SQ FT BUILDING FOR WAREHOUSE. "F" OCCUPANCY, TYPE III-B CONSTRUCTION
- ZONING TEXT AMENDMENT TO ALLOW TRUCK TERMINAL IN IP DISTRICT WITH CUP; CUP FOR AMAZON LOGISTICS TRUCK TERMINAL
- SUBDIVISION OF AN (E) WAREHOUSE LEASED SPACE INTO INDIVIDUAL TENANT UNITS USING PRE-FABRICATED PARTITION SYSTEM, SEE TEXT
- CONSTRUCT A 7,844 SQ. FT. ADDITION TO AN EXISTING WAREHOUSE
- TI FOR NON-CONDITIONED SHELL BUILDING 93,515 SQ FT. (3224 OFFICE/90,291 WAREHOUSE)
- SPECULATIVE OFFICE TI BUILDOUT 2,529 SQ FT AND WAREHOUSE LIGHTING (REFER TO SHELL 202105270)
