Armpower CJSC
The status, timeline and source of this project. A free account opens every field.
Source: Deutsche Investitions- und Entwicklungsgesellschaft (DEG)
The ArmPower CJSC (“ArmPower”) project involves the development, financing, construction, operation and maintenance of a 254MW combined cycle gas turbine (“CCGT”) power plant close to Yerevan, Armenia with an annual output of up to 2,000 GWh, under a Build-Own-Operate-Transfer (“BOOT”) scheme. The Project is critical to the Armenian power sector as it replaces a degenerated, existing CCGT plant w
- Status
- Prospective
- Sector
- Commercial, Geothermal, Power Generation (CCGT), Wind
- Location
- Armenia
- Updated
- 19 Nov 2026
- Source
- Deutsche Investitions- und Entwicklungsgesellschaft (DEG)
ConstructChat
Ask ConstructChat about Armpower CJSC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The ArmPower CJSC (“ArmPower”) project involves the development, financing, construction, operation and maintenance of a 254MW combined cycle gas turbine (“CCGT”) power plant close to Yerevan, Armenia with an annual output of up to 2,000 GWh, under a Build-Own-Operate-Transfer (“BOOT”) scheme. The Project is critical to the Armenian power sector as it replaces a degenerated, existing CCGT plant with low efficiency.The project shareholders are Renco, Italy (60%) and Siemens, Germany (40%).The SPV established in year 2016 by the Sponsors Renco and Siemens in Armenia has the main objectives to provide reliable power supplies, to promote internal Armenian power production, to promote commercial development of thermal technology and cost reduction that will enable Armenia to become a major net exporter of electricity and to build and sustain the domestic capacity in the development and maintenance of power generation infrastructure.The project promotes the replacement of an inefficient depreciated power generation asset with a high-efficiency CCGT. The Project as one of the cheapest energy producers in the country saves at least USD 30m p.a. in gas costs for the GoA in comparison to a degenerated, existing gas-fired power plant with low efficiency and ensuring reliable power supply. In addition, it will further strengthening the Armenian power sector by diversifying the investor base through private sector participation.DEG supports the Project to cover cost overruns and reach COD. |
Original sector | Infrastructure |
Budget |
Location
Country | Armenia |
Source
Source | Deutsche Investitions- und Entwicklungsgesellschaft (DEG) |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Power Generation (CCGT), Wind |
Article published date | 2024-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
