Rodney District Council, which is responsible for the area, also considered the ability of the plant to protect the marine environment on the Hibiscus Coast. The NZD$10m upgrade was approved and commissioned in March 2006. There are currently 35,000 residents in the Rodney area with a projected population increase of 81,000 by 2051. An expansion of Rodney District’s Army Bay Sewage Treatment Plan

Project Information FAQ

Project Information

5 Q
The project “Army Bay Sewage Treatment Plant Expansion, Rodney District” is an infrastructure initiative in the Cement sector, located in Thailand. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Rodney District Council, which is responsible for the area, also considered the ability of the plant to protect the marine environment on the Hibiscus Coast. The NZD$10m upgrade was approved and commissioned in March 2006. There are currently 35,000 residents in the Rodney area with a projected population increase of 81,000 by 2051. An expansion of Rodney District’s Army Bay Sewage Treatment Plant in New Zealand was completed in 2007. The plant required an increase in treatment capacity due to rising sewage wastewater production from reticulated areas on the Hibiscus Coast, which includes Orewa and the Whangaparaoa Peninsula. Rodney District Council consdiered the ability of the plant to protect the marine environment on the Hibiscus Coast. There are currently 35,000 residents in the Rodney area with a projected population increase of 81,000 by 2051. The Rodney District Council asked Sinclair Merz Knight (SKM) to conduct a study on the plant and determine what could be done to increase its operational life. SKM recommended a NZD$10m upgrade, which was later approved and commissioned in March 2006. SKM produced a detailed design for the plant and provided civil, structural, mechanical, and electrical engineering services, as well as construction supervision, project management, and commissioning. The project also formed a basis for the design of three new wastewater treatment plants for the neighbouring Thames-Coromandel District Council. The plant was equipped with a new grit removal and handling system along with new enhanced sequential batch reactors (ESBR), including a decanted and aeration system. An ultraviolet light (UV) system was also installed for the final disinfection of the treated effluent. The existing sequential batch reactors (SBRs) were also upgraded. HEB Construction was granted a $1.8m contract to construct two pumping stations, a concrete SBR tank, a concrete grit trap chamber, and a blower building. In addition, batch reactor tanks SBR1 and SBR2 were retrofitted with baffle walls, the existing flow splitter was modified, and other metal work was carried out by HEB. The aeration, mixing, pumping, and piping works were carried out by Service Engineers Limited on a design build basis. The electrical works and upgradation of the SBRs were handled by Current Electrical (CE). Under this contract, controls for the dissolved air flotation tanks, centrifuges, and the discharge pump station were upgraded. CE was responsible for installing one new SBR and rewiring the existing two SBRs, which were also fitted with a new 750kVA control panel and very early smoke detection apparatus (VESDA) alarms. In 2009, CE won another contract to install a new Alpha Level Centrifuge and other equipment. CE also installed a Sindico Gravity Belt Thickener in 2010, alongside all the necessary controls. The upgraded plant won a silver award for SKM at the Association of Consulting Engineers of New Zealand (ACENZ) INNOVATE NZ awards of excellence in August 2007 for its environmental consideration and relationship management of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data