logo
ProjectPre-Design

Aroostook Renewable Gateway Project

Sector: Power Generation (CCGT) • Location: Reed, Maine, United States of America

Source: Dodge USA

Upgrades for Section 80, a 115-kilovolt, 160-mile transmission line that runs between Coopers Mills substation in Windsor and the Highland substation in Warren, Maine

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Commercial, Manufacturing (Industrial)
Location
Reed, Maine, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Aroostook Renewable Gateway Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Aroostook Renewable Gateway Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Reed, Maine, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Upgrades for Section 80, a 115-kilovolt, 160-mile transmission line that runs between Coopers Mills substation in Windsor and the Highland substation in Warren, Maine

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maine

City

Reed

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Commercial, Manufacturing (Industrial)

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project