logo

ARP Backwash Pond Construction

Sector: Water Supply and Storage • Location: Elizabethton, Tennessee, United States of America

Source: Dodge

Project
Bid Results

The First Utility District of Carter County will receive separate sealed BIDS for the construction of New Backwash Pond Carter County ARP Water Infrastructure Grant Funding

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)
Location
Elizabethton, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about ARP Backwash Pond Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ARP Backwash Pond Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Elizabethton, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The First Utility District of Carter County will receive separate sealed BIDS for the construction of New Backwash Pond Carter County ARP Water Infrastructure Grant Funding

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Elizabethton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project