ARPA - Oakfield Acres - Belle Meade Drainage Improvements
Sector: Water Supply and Storage • Location: Pensacola, Florida, United States of America
Source: Dodge USA
A drainage improvements project that includes 1,000 LF of roadside drainage improvements, subsurface drainage system, utility coordination/relocations and driveway improvements to provide conveyance for existing stormwater runoff and an emergency popoff for the Monarch Place Subdivision. The system will discharge to the Royal Lane Detention Pond. The pond includes a 1.0-acre pond that will be 8 fe
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Road, Raw Materials, Waste Processing and Treatment, Commercial
- Location
- Pensacola, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ARPA - Oakfield Acres - Belle Meade Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A drainage improvements project that includes 1,000 LF of roadside drainage improvements, subsurface drainage system, utility coordination/relocations and driveway improvements to provide conveyance for existing stormwater runoff and an emergency popoff for the Monarch Place Subdivision. The system will discharge to the Royal Lane Detention Pond. The pond includes a 1.0-acre pond that will be 8 feet in depth, provide detention and improve water quality for Carpenter s Creek. The pond will dis... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Pensacola |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Road, Raw Materials, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
