logo

ARPA Fiber Build Phase 3

Sector: Power Transmission • Location: Poulsbo, Washington, United States of America

Source: Dodge

Project
Closed

for the ARPA Fiber Build Phase 3 Project using the strand and lash construction methods along PSE poles, and installation of conduit in Kitsap County, City of Poulsbo, and City of Bainbridge Island ROW located in Poulsbo, WA, Kingston, WA, Bainbridge Island, WA, Port Orchard, WA and Suquamish, WA. Project work includes installation of approximately 35,258 feet of aerial fiber work, 4,440 feet of u

Status
Closed
Sector
Power Transmission, Seaport, Road, Commercial, Power Generation (CCGT), Tunnel, Government
Location
Poulsbo, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about ARPA Fiber Build Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ARPA Fiber Build Phase 3” is an infrastructure initiative in the Power Transmission sector, located in Poulsbo, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

for the ARPA Fiber Build Phase 3 Project using the strand and lash construction methods along PSE poles, and installation of conduit in Kitsap County, City of Poulsbo, and City of Bainbridge Island ROW located in Poulsbo, WA, Kingston, WA, Bainbridge Island, WA, Port Orchard, WA and Suquamish, WA. Project work includes installation of approximately 35,258 feet of aerial fiber work, 4,440 feet of underground fiber work, and other work as indicated in the plans and specifications which can be f...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Poulsbo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Transmission, Seaport, Road, Commercial, Power Generation (CCGT), Tunnel, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project