ARPA Robin's Ridge Drainage Improvements
Sector: Water Supply and Storage • Location: Pensacola, Florida, United States of America
Source: Dodge USA
The purpose of the project is to construct a new storm sewer drainage system along N. Oakfield Drive adjacent to West Florida High School to alleviate flooding within the Robin s Ridge Subdivision. The proposed improvements will include reconstruction of half of the roadway pavement to install the 18 - 24 storm line on the east side of the road from the FPL substation to the County Pond approximat
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Raw Materials, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Pensacola, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ARPA Robin's Ridge Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to construct a new storm sewer drainage system along N. Oakfield Drive adjacent to West Florida High School to alleviate flooding within the Robin s Ridge Subdivision. The proposed improvements will include reconstruction of half of the roadway pavement to install the 18 - 24 storm line on the east side of the road from the FPL substation to the County Pond approximately 800 LF in length. Milling and Resurfacing of the remaining pavement will be required as well ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Pensacola |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Raw Materials, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
