ARPA Watermain Replacement Project - Phase II
Sector: Water Supply and Storage • Location: Somerset, Massachusetts, United States of America
Source: Dodge USA
The project consist of the removal and disposal of approximately 1800 L.F. of 2.5" galvanizes steel watermain which will be replaced with approximately 1800 L.F. of 6" PVC watermain. The project will include new plastic services from the mains to the property lines, installation of new fire hydrants, furnish and install new isolation valves, curb stops, corporations, tapping valves and sleeves, an
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial), Metal, Steel
- Location
- Somerset, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ARPA Watermain Replacement Project - Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consist of the removal and disposal of approximately 1800 L.F. of 2.5" galvanizes steel watermain which will be replaced with approximately 1800 L.F. of 6" PVC watermain. The project will include new plastic services from the mains to the property lines, installation of new fire hydrants, furnish and install new isolation valves, curb stops, corporations, tapping valves and sleeves, and trench piping. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Somerset |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial), Metal, Steel |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
