logo

ARP/II-Integrated Solid Waste Management

Sector: Road • Location: Azerbaijan

Source: World Bank

Project
Closed

The objective of the Azerbaijan Absheron Rehabilitation Program (AARP)/Integrated Solid Waste Management Project is to support the reform of the Greater Baku solid waste collection and disposal operations into an effective and sustainable system in the fields of:(i) improving environmental conditions at the existing waste disposal sites; (ii) building-up operational, management and communication c

Project Information FAQ

Project Information

5 Q
The project “ARP/II-Integrated Solid Waste Management” is an infrastructure initiative in the Road sector, located in Azerbaijan. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Azerbaijan Absheron Rehabilitation Program (AARP)/Integrated Solid Waste Management Project is to support the reform of the Greater Baku solid waste collection and disposal operations into an effective and sustainable system in the fields of:(i) improving environmental conditions at the existing waste disposal sites; (ii) building-up operational, management and communication capabilities; (iii) rollout of collection services; and (iv) data collection and planning. There are five components to the project. The first component is the institutional reform, capacity building and project management. This component will support: (a) the completion of strategic planning; (b) the legal, financial, and organizational corporatization and establishment; (c) the operationalization; and (d) capacity building of the new joint stock Solid Waste Management Company (SWMC). The second component is the balakhani landfill rehabilitation and management. The investment aims to upgrade operations at the current site, deal with the negative environmental impacts from site operations including the closure of inactive areas. It will finance equipment (weighbridges, bulldozers, etc) and civil works (fencing, waste coverage, drainage control, internal roads, etc.) to control environmental impacts and improve site-use effectiveness while other solid waste management options are developed. The third component is the closure and management of other dumps. It will finance closure and cleanup of the informal dumps and improve management (or close) formal sites identified in the strategic plan. The fourth component is the urgent collection equipment for under-served Baku districts. It will help increase service quality and availability throughout the region, including areas that now lack effective collection, by financing urgently needed trucks, containers and bins to improve solid waste collection coverage and service efficiency in the most acutely underserved areas of greater Baku. Finally, the fifth component is the technical preparation of post-project investments. It will finance feasibility studies and environmental impact assessments needed to develop landfill capacity and introduce transfer stations to maintain an effective enhanced collection system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data