logo
ProjectBidding

Arrow North Structural Maintenance IQC

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Works under this contract will be assigned on an as needed basis. Such works may include road upgrade or reconstruction, slope stabilization, road deactivation or routine road or bridge maintenance. Works will be located within the BC Timber Sales Arrow South operating areas as shown on the project map. From the south end of Slocan Lake to Beaton Arm. Mob and De-mob will be paid from whichever is

Status
Prospective
Sector
Commercial, Bridge, Road, Forest Products and Packaging
Location
Nakusp, British Columbia, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Arrow North Structural Maintenance IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Arrow North Structural Maintenance IQC” is an infrastructure initiative in the Commercial sector, located in Nakusp, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Works under this contract will be assigned on an as needed basis. Such works may include road upgrade or reconstruction, slope stabilization, road deactivation or routine road or bridge maintenance. Works will be located within the BC Timber Sales Arrow South operating areas as shown on the project map. From the south end of Slocan Lake to Beaton Arm. Mob and De-mob will be paid from whichever is closer, the location of the machine to the work or Nakusp, BC.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Nakusp

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Road, Forest Products and Packaging

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project