Artemis Transmissora de Energia SA

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In 2004, the Brazilian electricity regulator Aneel signed with Artemis Transmissora de Energia SA a 30 year contract to build, own, and operate an electricity transmission line between Ivaipora and Londriana in Parana state. The project was designed with length of 376 kms and was one of the seven transmission line concessions granted by Aneel in 2003-04. All lines had a total length of 1,787 km an

Project Information FAQ

Project Information

4 Q
The project “Artemis Transmissora de Energia SA” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2004, the Brazilian electricity regulator Aneel signed with Artemis Transmissora de Energia SA a 30 year contract to build, own, and operate an electricity transmission line between Ivaipora and Londriana in Parana state. The project was designed with length of 376 kms and was one of the seven transmission line concessions granted by Aneel in 2003-04. All lines had a total length of 1,787 km and represented investments for US$614 million. Aneel tendered those projects with the approval of Brazilian National Privatization Council. In 2003, Artemis Transmissora de Energia was owned by Spanish ACS (51%) through its subsidiary Control y Montajes industriales, state-owned Electrosul (46.5%), and Brazilian Santa Rita Comercio Engenharia (2.5%). Artemis Transmissora de Energia won the transmission line contract through a competitive tender by requesting the lowest transmission tariff in late 2003. The consortium also agreed to pay annual concession fees amounting to a total of US$ 5 million. The transmission line cost was estimated at US$96.9 million. The project reached financial closure in June 2005 with a US$68.6 million loan from BNDES. Sponsors provided the remaining funding through equity. Commercial operations commenced in October 2005. Fin Closure 06/2005?

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data