Artemis Transmissora de Energia SA
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
In 2004, the Brazilian electricity regulator Aneel signed with Artemis Transmissora de Energia SA a 30 year contract to build, own, and operate an electricity transmission line between Ivaipora and Londriana in Parana state. The project was designed with length of 376 kms and was one of the seven transmission line concessions granted by Aneel in 2003-04. All lines had a total length of 1,787 km an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In 2004, the Brazilian electricity regulator Aneel signed with Artemis Transmissora de Energia SA a 30 year contract to build, own, and operate an electricity transmission line between Ivaipora and Londriana in Parana state. The project was designed with length of 376 kms and was one of the seven transmission line concessions granted by Aneel in 2003-04. All lines had a total length of 1,787 km and represented investments for US$614 million. Aneel tendered those projects with the approval of Brazilian National Privatization Council. In 2003, Artemis Transmissora de Energia was owned by Spanish ACS (51%) through its subsidiary Control y Montajes industriales, state-owned Electrosul (46.5%), and Brazilian Santa Rita Comercio Engenharia (2.5%). Artemis Transmissora de Energia won the transmission line contract through a competitive tender by requesting the lowest transmission tariff in late 2003. The consortium also agreed to pay annual concession fees amounting to a total of US$ 5 million. The transmission line cost was estimated at US$96.9 million. The project reached financial closure in June 2005 with a US$68.6 million loan from BNDES. Sponsors provided the remaining funding through equity. Commercial operations commenced in October 2005. Fin Closure 06/2005? |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
