logo

Artemis Transmissora de Energia SA

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In 2004, the Brazilian electricity regulator Aneel signed with Artemis Transmissora de Energia SA a 30 year contract to build, own, and operate an electricity transmission line between Ivaipora and Londriana in Parana state. The project was designed with length of 376 kms and was one of the seven transmission line concessions granted by Aneel in 2003-04. All lines had a total length of 1,787 km an

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Artemis Transmissora de Energia SA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Artemis Transmissora de Energia SA” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2004, the Brazilian electricity regulator Aneel signed with Artemis Transmissora de Energia SA a 30 year contract to build, own, and operate an electricity transmission line between Ivaipora and Londriana in Parana state. The project was designed with length of 376 kms and was one of the seven transmission line concessions granted by Aneel in 2003-04. All lines had a total length of 1,787 km and represented investments for US$614 million. Aneel tendered those projects with the approval of Brazilian National Privatization Council. In 2003, Artemis Transmissora de Energia was owned by Spanish ACS (51%) through its subsidiary Control y Montajes industriales, state-owned Electrosul (46.5%), and Brazilian Santa Rita Comercio Engenharia (2.5%). Artemis Transmissora de Energia won the transmission line contract through a competitive tender by requesting the lowest transmission tariff in late 2003. The consortium also agreed to pay annual concession fees amounting to a total of US$ 5 million. The transmission line cost was estimated at US$96.9 million. The project reached financial closure in June 2005 with a US$68.6 million loan from BNDES. Sponsors provided the remaining funding through equity. Commercial operations commenced in October 2005. Fin Closure 06/2005?

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project