Artemisya BESS
Sector: Road • Location: Uzbekistan
Source: European Bank for Reconstruction and Development (EBRD)
The project involves the development, construction, and operation of a 100 MW / 200 MWh Battery Energy Storage System (BESS) and a 15 km, 220 kV overhead transmission line in the Bukhara region of Uzbekistan, developed by Voltalia SA.
EBRD financing of the 100 MW / 200 MWh BESS relates only to the Phase I of the Artemisya complex (captured by the ESIA package). Download zip package in English Dow
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Wind, Solar, Warehouse, Geothermal, Power Generation (CCGT), Energy Storage, Commercial, Raw Materials, Residential
- Location
- Uzbekistan
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Artemisya BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in exploratory, pending concept review |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development, construction, and operation of a 100 MW / 200 MWh Battery Energy Storage System (BESS) and a 15 km, 220 kV overhead transmission line in the Bukhara region of Uzbekistan, developed by Voltalia SA. EBRD financing of the 100 MW / 200 MWh BESS relates only to the Phase I of the Artemisya complex (captured by the ESIA package). Download zip package in English Download zip package in Russian Download zip package in Uzbek Full ESIA documentation is available locally at: EBRD Tashkent Resident Office, Banking Association of Uzbekistan, 13th floor, 1, Qoratosh Street, Tashkent, 100027, Uzbekistan and Client website: https://www.artemisya-hybrid.com/en Environmental or social enquiries Zukhra Sharipova Social Advisor, Voltalia z.sharipova@voltalia.com +998773537318 Shahrisabz street, block 5A 100060 Mirabad District, Tashkent |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Wind, Solar, Warehouse, Geothermal, Power Generation (CCGT), Energy Storage, Commercial, Raw Materials, Residential |
Article published date | 2026-10-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Uzbekistan
- Fergana Refinery Modernisation
- South-West Gissar Project
- Kandym Gas Processing Complex (KGPC)
- Second CAREC Corridor 2 Road Investment Program - Tranche 3
- CAREC Corridor 2 Road Investment Program - Tranche 2
- CAREC Regional Road Project
- Angren Power Station New Unit
- CAREC Corridor 2 Road Investment Program - Tranche 3
