logo
ProjectIn Exploratory, Pending Concept Review

Artemisya BESS

Sector: Road • Location: Uzbekistan

Source: European Bank for Reconstruction and Development (EBRD)

The project involves the development, construction, and operation of a 100 MW / 200 MWh Battery Energy Storage System (BESS) and a 15 km, 220 kV overhead transmission line in the Bukhara region of Uzbekistan, developed by Voltalia SA.

EBRD financing of the 100 MW / 200 MWh BESS relates only to the Phase I of the Artemisya complex (captured by the ESIA package). Download zip package in English Dow

Status
Prospective
Sector
Road, Water Supply and Storage, Wind, Solar, Warehouse, Geothermal, Power Generation (CCGT), Energy Storage, Commercial, Raw Materials, Residential
Location
Uzbekistan
Updated
19 Nov 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Artemisya BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Artemisya BESS” is an infrastructure initiative in the Road sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

in exploratory, pending concept review

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project involves the development, construction, and operation of a 100 MW / 200 MWh Battery Energy Storage System (BESS) and a 15 km, 220 kV overhead transmission line in the Bukhara region of Uzbekistan, developed by Voltalia SA. EBRD financing of the 100 MW / 200 MWh BESS relates only to the Phase I of the Artemisya complex (captured by the ESIA package). Download zip package in English Download zip package in Russian Download zip package in Uzbek Full ESIA documentation is available locally at: EBRD Tashkent Resident Office, Banking Association of Uzbekistan, 13th floor, 1, Qoratosh Street, Tashkent, 100027, Uzbekistan and Client website: https://www.artemisya-hybrid.com/en Environmental or social enquiries Zukhra Sharipova Social Advisor, Voltalia z.sharipova@voltalia.com +998773537318 Shahrisabz street, block 5A 100060 Mirabad District, Tashkent

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Wind, Solar, Warehouse, Geothermal, Power Generation (CCGT), Energy Storage, Commercial, Raw Materials, Residential

Article published date

2026-10-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project