Artemisya Wind
Active
Source: European Bank for Reconstruction and Development (EBRD)
The project involves the development, construction, and operation of a 100 MW wind power plant and a 15 km, 220 kV overhead transmission line in the Bukhara region of Uzbekistan, developed by Voltalia SA. Overhead transmission line will be built as part of the adjacent Artemisya Battery Energy Storage System (BESS) project, developed by Voltalia SA. EBRD financing of the 100 MW wind power plant re
- Status
- Prospective
- Sector
- Road, Power Generation (CCGT), Energy Storage, Wind, Commercial, Residential
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Artemisya Wind
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development, construction, and operation of a 100 MW wind power plant and a 15 km, 220 kV overhead transmission line in the Bukhara region of Uzbekistan, developed by Voltalia SA. Overhead transmission line will be built as part of the adjacent Artemisya Battery Energy Storage System (BESS) project, developed by Voltalia SA. EBRD financing of the 100 MW wind power plant relates only to the Phase I of the Artemisya complex (captured by the ESIA package). Download zip package in English Download zip package in Russian Download zip package in Uzbek Full ESIA documentation is available locally at: EBRD Tashkent Resident Office, Banking Association of Uzbekistan, 13th floor, 1, Qoratosh Street, Tashkent, 100027, Uzbekistan and Client website: https://www.artemisya-hybrid.com/en Environmental or social enquiries Zukhra Sharipova Social Advisor, Voltalia z.sharipova@voltalia.com +998773537318 Shahrisabz street, block 5A 100060 Mirabad District, Tashkent |
Location
| Not available for this record. |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Energy Storage, Wind, Commercial, Residential |
Article published date | 2026-08-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
