Arterial Roadway Landscaping Phase 2
Sector: Water Supply and Storage • Location: Jupiter, Florida, United States of America
Source: Dodge USA
The scope of work consists of but is not limited to obtaining any required maintenance of traffic approvals, the removal of existing vegetation, tree/shrub installation, irrigation system repairs, St. Augustine sod installation, landscape soil installation, Limestone boulders installation, and sustaining installed trees/shrubs during an establishment period along 12 major arterial roadways in the
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Consumer Products, Manufacturing (Industrial)
- Location
- Jupiter, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Arterial Roadway Landscaping Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work consists of but is not limited to obtaining any required maintenance of traffic approvals, the removal of existing vegetation, tree/shrub installation, irrigation system repairs, St. Augustine sod installation, landscape soil installation, Limestone boulders installation, and sustaining installed trees/shrubs during an establishment period along 12 major arterial roadways in the Town of Jupiter. The project limits are A1A (from just south of Marcinski Road to just north of O... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Jupiter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Consumer Products, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
