Arthur Gold Project
Sector: Mining • Location: Beatty, Nevada, United States
Source: TipRanks
The Arthur Gold Project is a large-scale open-pit gold mining operation in Nevada's Beatty Mining District. It has a first-time Probable Mineral Reserve of 4.9 million ounces of gold and 7.8 million ounces of silver as of December 31, 2025. The project targets about 500,000 ounces of annual gold production at competitive costs, with an initial nine-year mine life and an estimated project capital o
- Status
- Prospective
- Sector
- Mining
- Location
- Beatty, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Arthur Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arthur Gold Project is a large-scale open-pit gold mining operation in Nevada's Beatty Mining District. It has a first-time Probable Mineral Reserve of 4.9 million ounces of gold and 7.8 million ounces of silver as of December 31, 2025. The project targets about 500,000 ounces of annual gold production at competitive costs, with an initial nine-year mine life and an estimated project capital of approximately $3.6 billion. A feasibility study approval is expected in June 2026, with potential for mine life extension and scaling. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Beatty |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
