Arthur Gold Project
Planned · Nevada · Last reported Dec 2025
Source: Bitget
The Arthur Gold Project in Nevada includes the Merlin and Silicon deposits in southern Nevada’s Beatty Mining District. It has a probable mineral reserve of 4.9 million ounces of gold and 7.8 million ounces of silver. The project plans an initial nine-year mine life with average annual production of approximately 500,000 ounces of gold. Development includes a 7 million tonne per annum milling faci
- Status
- Prospective
- Sector
- Mining
- Location
- Beatty, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Bitget
ConstructChat
Ask ConstructChat about Arthur Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arthur Gold Project in Nevada includes the Merlin and Silicon deposits in southern Nevada’s Beatty Mining District. It has a probable mineral reserve of 4.9 million ounces of gold and 7.8 million ounces of silver. The project plans an initial nine-year mine life with average annual production of approximately 500,000 ounces of gold. Development includes a 7 million tonne per annum milling facility and a 5.5 million tonne per annum crushed heap-leach circuit using conventional open-pit mining methods. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Beatty |
Source
Source | Bitget |
URL |
More Details
Record type | Project |
Article published date | 2026-03-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
