Arthur Gold Project
The owner, status and timeline of this project. A free account opens every field.
Source: E & MJ
The Arthur gold project near Beatty, Nevada, is an open-pit gold mining project by AngloGold Ashanti (AGA). It includes the Silicon and Merlin deposits and is positioned as a Tier 1 gold deposit with robust economics. The project plans a 7 million mt/y milling facility and a 5.5 million mt/y crushed heap-leach circuit with filtered, dry-stacked tailings to conserve water. The initial mine life is
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- Beatty, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- E & MJ
ConstructChat
Ask ConstructChat about Arthur Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arthur gold project near Beatty, Nevada, is an open-pit gold mining project by AngloGold Ashanti (AGA). It includes the Silicon and Merlin deposits and is positioned as a Tier 1 gold deposit with robust economics. The project plans a 7 million mt/y milling facility and a 5.5 million mt/y crushed heap-leach circuit with filtered, dry-stacked tailings to conserve water. The initial mine life is nine years with average annual production of approximately 500,000 oz of gold. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
City | Beatty |
Source
Source | E & MJ |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
