Arthur Gold Project
Sector: Mining • Location: Beatty, Nevada, United States
Source: Geomechanics.io
AngloGold Ashanti's Arthur project in Nevada's Beatty district with 4.9 million oz of gold reserves across the Silicon and Merlin deposits. The project has an initial nine-year mine life with average output of 500,000 oz/y, mostly oxide mineralisation suited to bulk mining and conventional processing. Initial capex is estimated at $3.6 billion with feasibility work starting June alongside environm
- Status
- Prospective
- Sector
- Mining
- Location
- Beatty, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Geomechanics.io
ConstructChat
Ask ConstructChat about Arthur Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-feasibility completed, feasibility work starting |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AngloGold Ashanti's Arthur project in Nevada's Beatty district with 4.9 million oz of gold reserves across the Silicon and Merlin deposits. The project has an initial nine-year mine life with average output of 500,000 oz/y, mostly oxide mineralisation suited to bulk mining and conventional processing. Initial capex is estimated at $3.6 billion with feasibility work starting June alongside environmental and hydrological baseline studies. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Beatty |
Source
Source | Geomechanics.io |
URL |
More Details
Record type | Project |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
