Arthurs Face Road Construction - Boundary
Sector: Bridge • Location: Kootenay, British Columbia, Canada
Source: Dodge USA
This contract consists of new road construction, road reconstruction, road maintenance, and the installation of one temporary all steel portable bridge. Approximately 5.78 km s of new construction, 2.11 km s of reconstruction, 41.23 km s of road maintenance, and the installation of one bridge will be required. Refer to contract EN25TFF008 Schedules for additional details.
- Status
- Closed
- Sector
- Bridge, Steel, Road, Metal, Commercial, Manufacturing (Industrial)
- Location
- Kootenay, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Arthurs Face Road Construction - Boundary
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract consists of new road construction, road reconstruction, road maintenance, and the installation of one temporary all steel portable bridge. Approximately 5.78 km s of new construction, 2.11 km s of reconstruction, 41.23 km s of road maintenance, and the installation of one bridge will be required. Refer to contract EN25TFF008 Schedules for additional details. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Kootenay |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Steel, Road, Metal, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
