logo

Artificial Lake Energy Storage Project in Arizona Desert

Sector: Solar • Location: Phoenix metro area, Arizona, United States

Source: ECOticias.com El Periódico Verde

Project
Planned

The Salt River Project (SRP) plans to build a huge artificial lake in the desert of Arizona to improve energy storage capabilities. This pumped storage hydropower system aims to store renewable energy, particularly solar power, by pumping water uphill during excess solar generation and releasing it to generate electricity when needed. The project is designed to have a lifespan of 100 years and a p

Status
Prospective
Sector
Solar, Mass Transit, Hydro, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Commercial, Residential, Government
Location
Phoenix metro area, Arizona, United States of America
Updated
22 Jul 2026
Source
ECOticias.com El Periódico Verde

ConstructChat

Ask ConstructChat about Artificial Lake Energy Storage Project in Arizona Desert

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Artificial Lake Energy Storage Project in Arizona Desert” is an infrastructure initiative in the Solar sector, located in Phoenix metro area, Arizona, United States. Taiyo aggregates data on it from ECOticias.com El Periódico Verde.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Salt River Project (SRP) plans to build a huge artificial lake in the desert of Arizona to improve energy storage capabilities. This pumped storage hydropower system aims to store renewable energy, particularly solar power, by pumping water uphill during excess solar generation and releasing it to generate electricity when needed. The project is designed to have a lifespan of 100 years and a potential energy output of up to 2,000 megawatts, capable of powering approximately 450,000 homes for about 10 hours. The project faces environmental and logistical challenges, including concerns from local tribes and the presence of various species in the area. Construction is targeted to start by 2027 with operations beginning by 2033, and the project is expected to cost millions of dollars.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Phoenix metro area

Source

Source

ECOticias.com El Periódico Verde

URL

More Details

Record type

Project

Sector

Solar, Mass Transit, Hydro, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Commercial, Residential, Government

Article published date

2025-06-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project