Artificial Surface Replacement & Drainage Sys Restoration RE
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The City of Brampton ( City ) requires the services of a General Contractors offering construction services to replace perimeter and internal drainage channels and artificial surface replacement on an outdoor Lawn Bowling Field at the Flower City Community Campus. Replacement is required to maintain a state of good condition of Bowling Centre.
- Status
- Closed
- Sector
- Raw Materials, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage
- Location
- Brampton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Artificial Surface Replacement & Drainage Sys Restoration RE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Brampton ( City ) requires the services of a General Contractors offering construction services to replace perimeter and internal drainage channels and artificial surface replacement on an outdoor Lawn Bowling Field at the Flower City Community Campus. Replacement is required to maintain a state of good condition of Bowling Centre. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Brampton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
