Artificial Surface Replacement and Restoration of Drainage
Bid results, design development · Ontario · Last reported Jul 2024
Source: Dodge USA
The City of Brampton ( City ) requires the services of a General Contractors offering construction services to replace perimeter and internal drainage channels and artificial surface replacement on an outdoor Lawn Bowling Field at the Flower City Community Campus. Replacement is required to maintain a state of good condition of Bowling Centre.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Raw Materials
- Location
- Brampton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Artificial Surface Replacement and Restoration of Drainage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results, design development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Brampton ( City ) requires the services of a General Contractors offering construction services to replace perimeter and internal drainage channels and artificial surface replacement on an outdoor Lawn Bowling Field at the Flower City Community Campus. Replacement is required to maintain a state of good condition of Bowling Centre. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Brampton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Raw Materials |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
